CV4.4 BUILDING

LE DUC THO STREET - NAM TU LIEM DISTRICT - HANOI CITY

Description


1. Project Location: The Project sits on part of a land plot denoted as CV4.4 in Phu Do Ward, Nam Tu Liem District, in the capital city of Hanoi. The Project is surrounded by:

  • The Northeast side is adjacent to land plot CV2.2 (a complex area managed by Phu Do Ward) and Le Quang Dao Highway.
  • The Southeast side is adjacent to land plot CV2.2 and Chau Van Liem street.
  • The Southwest side borders An Sinh General Hospital (ongoing project).
  • The North and the Northwest sides are adjacent to local roads and residential areas of Phu Do Ward.
2. Scale & Images of the Project Site (approved):
  • Total land area: 25,478m2.
  • Construction area: 8,128,9m2.
  • Construction density: 31.9%.
  • Surrounding space area: 17,349.1m2.
  • Total floor area (excluding basement): 158,368m2.
  • Basement: 03 floors
  • Total basement floor area: 72,573m2.
  • Number of floors: 30-35 floors.
3. Legal documents regarding the Project:
  • Decision No. 2486/QD-UBND dated December 9, 2008 of the People's Committee of Hanoi City regarding the Approval of the proposed adjustment to the detailed planning at a scale of 1/2000 for the Southwest Hanoi Cultural and Sports Park.
  • Document No. 4508/UBND-KH&DT dated June 18, 2010 of the People's Committee of Hanoi City regarding the Approval of the location for Petroleum Power Property JSC (PVPowerLand) to develop commercial construction projects for the purpose of providing commercial, cultural, sports services, and office space on a portion of land plot CV4.4 in Me Tri Commune, Tu Liem District (The validity period of the document has now expired).
  • Document No. 2969/VP-QHXDGT of the Hanoi People's Committee dated August 8, 2012 regarding the Master plan and preliminary Architectural plan of the commercial complex project for commercial, cultural, sports services and office space on a portion of land plot CV4.4 in Me Tri Commune, Tu Liem District, Hanoi.
  • Document No. 302/TC-QC of the Department of Operations – General Staff of the Vietnam People’s Army dated October 5, 2012 regarding the Approval of the vertical clearance of the construction project.
  • Document No. 2356/STNMT-DD&BD of the Hanoi Department of Natural Resources and Environment dated May 22, 2013 regarding the Inspection of the boundaries of neighboring projects surrounding the commercial complex project for commercial, cultural, sports services and office space on land plot CV4.4 in Me Tri Commune, Tu Liem District.
  • Document No. 4419/QHKT-P8 dated October 21, 2014 of the Hanoi Department of Planning and Economics regarding the Approval of the Master plan and preliminary Architectural plan of the commercial complex project for commercial, cultural, sports services and office space on a portion of land plot CV4.4 in Me Tri Commune, Tu Liem District, Hanoi.

Details


  • Location: Land Plot CV4.4, Le Duc Tho Street, Nam Tu Liem District, Hanoi
  • Land area: 2.54ha
  • Purpose: Commercial complex for commercial, culture, sports services and office space